THE FOLLOWING IS A WEEKLY STATE OF THE WHALE SKELETON ADDRESS
by Lee Post
Here
we are at the end of week four - my projected halfway point. Of course
we are way further along than that. At the beginning of the week we
were down to a bare pipe and no ribs at one point before heading the
other direction. Now we have all the vertebrae on the tail and the
pipe, most of the silicone done between the vertebrae, the rib
hanging pieces bent to shape and welded in place and the ribs back
on. In addition, the skull came down to join us and thanks to
Cheyenne and Wesley, the cleaning of the skull got started. Laurel
Patrick from Mexico joined us for a week. She has a 60-foot sperm
whale skeleton in her back yard south of Ixtapa at her nature refuge.
She came to get some hands-on experience working on big bones and
arrived at a great time to be very helpful. We also reached a point
on the flipper assembly of calling them done. They still need some
beautician work with the coloring but otherwise are fairly finished.
. .It was an exciting week.
This
next week we will be taking Thursday off. Otherwise it should be a
week of getting the rib hanging hardware painted and the ribs
fastened. We should be able to get rid of the woodwork inside the rib
cage so we can get close enough to finish up the silicone. Sam and
Marilyn are scheming on ways to create a full size tail for the
whale. Cheyenne and Wesley are going to start consolidating the
skull. Tammy and Kaylie are finishing up the tail section. There are
still fun projects so don't give up coming .
We
never did come up with a good T-shirt design. In a town full of
artists we should still try for that. Any great ideas?